Incident 2018/SAR/017/061 · NAOC · 31 Mar 2018
THERE WAS A VISIBLE INSTALLATION OF 3'' VALVE ON THE FACILITY @ 12 O' CLOCK POSITION FOR OIL THEFT PURPOSES.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI