Incident 2018/SAR/008/024 · NAOC · 4 Feb 2018
THERE WAS AN EVIDENCE OF HACKSAW CUT ON THE FACILITY @ (2 & 10) O' CLOCK POSITION
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI