Incident 2017/SAR/055/147 · NAOC · 17 Aug 2017
THERE WAS AN EVIDENCE OF HACKSAW CUT @ (3-9) O'CLOCK POSITION THEN EXPLOSIVE WAS USED TO BLAST THE FLOWLINE
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI