Incident 2017/LAR/GL1/024 · NAOC · 16 Aug 2017
THE WAS AN EVIDENCE OF HACK SAW CUT OF ABOUT 110mm ON THE PIPELINE @ (8-11) O'CLOCK POSITION.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI