Incident ERL/M148/HSSE/NOS/2020/02 · ERL · 29 Jan 2020
Vegetation and soil were impacted, the spill was within the company's right of way. (3'' installed vailve on the 6'' pipeline).
10'' EXPORT LINE OREDO - OLOGBO - OGHAREFE
OML 152 6'' FLOWLINE AROUND UMUGHUN NOKHUA ROW
6'' EXPORT PIPELINE TP3 AT KOLOKOLO
10'' GAS EXPORT PIPELINE AT OBAZAGBON
AROH FLOW LINE RIGHT OF WAY AT AJAMIMOGHAN