Incident 2017/SAR/NL/025 · NAOC · 23 Jul 2017
THERE WAS AN EVIDENT OF 3'' VALVE INSTALLATION ON THE P/L BUT NOT YET PUNCTURED. IT IS A NON-LEAK POINT (NIL SPILL)
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI