Incident 2017/LAR/005/006 · NAOC · 14 Jan 2017
A SHARP OF 90mm LONG CUT WAS OBSERVED @ (7-10) O'CLOCK POSITION ON THE FLOWLINE.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI