Incident 2017/SAR/007/017 · NAOC · 24 Jan 2017
VANDAL(S) CUT OFF CONE OF PREVIOUSLY REPAIRED POINT AND INSTALLED 3'' VALVE ON THE FACILITY FOR CRUDE THEFT ACTIVITIES
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI