Incident 2017/LAR/031/058 · NAOC · 17 Mar 2017
HACKSAW CUT OF 70mm LONG AND DRILLED HOLE OF 2mm @ 12 O'CLOCK POSITION WAS OBSERVED ON THE FACILITY.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI