Incident 160590 · RENAISSANCE · 5 Jun 2026
AS AT THE TIME OF JIV,THERE WAS A POOL OF WATER WITH A NEGLIGIBLE EMULSIFIED CRUDE OBSERVED SOME METERS APART FROM THE PIPELINE. OPON EXCAVATION, THERE WAS NO SIGN OF IMPACT ALONG THE LENGTH OF THE EXPOSED PIPELINE.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.
4'' ESCRAVOS WELL 3T FLOWLINE AT OGIDIGBEN