Incident 2015/SAR/219/354 · NAOC · 13 Sept 2015
ON EXCAVATION, A 3'' VALVE WAS OBSERVED INSTALLED @ 12 O' CLOCK POSITION ON THE PIPELINE BY UNKNOWN PERSONS FOR OIL THEFT ACTIVITIES. THERE WAS NO RELEASE OF CRUDE OIL AS THE PIPELINE WAS OBSERVED TO HAVE BEEN SHOT-IN BEFORE ARRIVAL OF THE JIV