Incident 2015/SAR/247/394 · NAOC · 17 Oct 2015
There was a visual installation of 2’’ valve on the previous repaired point 12 O’ Clock position. There was no oil leakage at the time of JIV.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State