Incident 2015/SAR/248/395 · NAOC · 19 Oct 2015
• There was evidence of 3’’ valve bunkering point installed at 12 ‘0clock position.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI