Incident 2015_1488510 · SPDC · 22 Sept 2015
• The JIV team upon arrival observed a small ditch dug by the suspected vandal (s). • Upon excavation, a hacksaw cut of about 150mm was observed on the pipeline by the team. • The team also observed that impacted area is only within the asset owners’ right of way. • At the time of JIV, crude oil is still spilling out the spill point.