Incident 2025_001772 · RENAISSANCE · 19 Jul 2025
i. It was observed that the soil at the incident point had been disturbed, sign of loose soil was evident. ii. Upon excavation and exposure, the JIT observed a hacksaw cut of about 10cm at 12-1 o'clock position caused by unknown person(s) for oil theft purpose. iii. It was a non-leaking point at time of JIV. iv. Repairs of the damaged portion of the pipeline was ongoing at the time of JIV.