Incident 2025_000166 · RENAISSANCE · 27 Jun 2025
Hack saw cut observed with a length of 110mm and effective cut of 80mm at 10 O'clock to 11 O'clock position
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.
4'' ESCRAVOS WELL 3T FLOWLINE AT OGIDIGBEN