Incident 215/SAR/029/043 · NAOC · 4 Feb 2015
TWO HACKSAW CUTS OF 4.5CM AT 3 O' CLOCK POSITION WITHIN A DISTANCE OF 7CM APART WITH A DENT DUE TO EXPLOSIVE DEVICE WAS OBSERVED ON THE FACILITY.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI