Incident 2015/SAR/032/046 · NAOC · 5 Feb 2015
RUPTURE ON THE LEVEL CONTROL VALVE (LCV) 3" VALVE OIL OUTLET AT THE HIGH PRESSURE SEPARATOR (HPS).
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI