Incident 2015/LAR/102/285 · NAOC · 3 Jul 2015
A dent and hacksaw cut of about 120mm in length at the 8 O'Clock to 11 O'Clock position. Crude oil spill was mnixed with drilling mud and water. Vegetation was affected even though it was on the facility right of way.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI