Incident 2015/SAR/160/254 · NAOC · 13 Jun 2015
3'' VALVE WAS INSTALLED AT 12'CLOCK POSITION BY UNKNOWN PERSONS ON THE FLOWLINE. 0.09 BARRELS WAS MOPPED UP ON THE SITE
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI