Incident 2015/SAR/159/252 · NAOC · 12 Jun 2015
6" and 3" valves were installed with a distance of 0.8m was installed on the pipeline. 50litres of crude was mopped at the time of JIV
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State