Incident 2024/SAR/222 · NAOC · 24 Sept 2024
Vandals cut off cone of previously repaired point and installed 3” valve at 12 o’ clock position of the pipeline for possible crude oil theft activity.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI