Incident 2024/SAR/190 · NAOC · 17 Aug 2024
The JIV team observed 2 numbers of hacksaw cuts was inflicted on the facility. Point 1 120mm hacksaw cut @ 8-12 Clock position. Point 2 100mm hacksaw cut @ 9-12 Clock position with a distance of 549mm meter Apart by unknown person(s) for oil theft activity.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI