Incident 2024/SAR/146 · NAOC · 4 Jul 2024
The JIV team observed that about 150mm length of three separate flowlines (on the same ROW) were cut and taken away by unknown persons thereby causing a spill incident as a result of the coming out of residual oil from the lines.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI