Incident 2024/SAR/219 · NAOC · 9 Sept 2024
A 100mm hacksaw cut from which oil was spilling was observed on the cone of a previously repaired point after the exposure of the facility.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI