Incident 3650636 · SPDC · 10 Sept 2024
Unknown persons installed 2" ball valve with a 1 1/2" pipe connection and 0.8 meters apart another 2" ball valve with a concrete cast at 12 o'clock position on the pipeline for oil theft activities
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
6'' AGGU A LOCATION
12" Oguta - Egbema P/L Umunku, Oguta LGA, Imo State.
OSSU OBODO WELL-14/21 AT OSSU OBODO
16" EGBEMA - ASSA TL ROW @ ETEKWURU, OHAJI/EGBEMA LGA, IMO STATE