Incident 2024/SAR/206 · NAOC · 30 Aug 2024
The delineation of impacted area was outside ROW. 2" valve was installed on the facility by unknown person(s) for suspected crude oil theft.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State