Incident 2024-SAR-178 · NAOC · 5 Aug 2024
UNKNOWN PERSON(S) CUT OFF THE CONE OF A PREVIOUSLY REPAIRED POINT AND INSTALLED A 3" VALVE AT THE 12 O'CLOCK POSITION OF THE FACILITY.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Environmental Barge Leakage at Nembe 1 Manifold.
ANGO FLOW STATION AT KOLUAMA
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
11 WELLHEAD MANIFOLD AT OKPAI COMMUNITY