Incident 2024/SAR/NL/099 · NAOC · 8 Aug 2024
UNKNOWN PERSON(S) INSTALLED A 3" VALVE AT THE 12 O'CLOCK POSITION OF THE FACILTIY.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI