Incident 2024/SAR/173 · NAOC · 31 Jul 2024
Unknown person(s) cut off the cone of a previously repaired point and installed a 2” valve at the 12 o’clock position of the facility.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI