Incident 2024/SAR/171 · NAOC · 29 Jul 2024
2" VALVE WITH PIPE CONNECTION WAS INSTALLED AT THE 12 O'CLOCK POSITION OF THE FACILITY FOR A SUSPECTED CRUDE OIL THEFT ACTIVITY.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI