Incident 2024/SAR/119 · NAOC · 28 May 2024
UNKNOWN PERSON(S) INSTALLED A 3" FLANGE VALVE WITH PIPE CONNECTION AT THE 12 O'CLOCK POSITION OF THE FACILITY FOR POSSIBLY CRUDE OIL THEFT ACTIVITY.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Environmental Barge Leakage at Nembe 1 Manifold.
ANGO FLOW STATION AT KOLUAMA
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
11 WELLHEAD MANIFOLD AT OKPAI COMMUNITY