Incident 2024/SAR/GL/030 · NAOC · 1 Jun 2024
VANDALS INFLICTED A 150MM HACKSAW CUT FROM THE 4 TO 8 O'CLOCK POSITION OF THE FACILITY FOR POSSIBLY GAS (CONDENSATE) THEFT ACTIVITY.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI