Incident 2023/SAR/NL/031 · NAOC · 3 Apr 2023
3" VALVE WITH PIPE CONNECTION WAS INSTALLED ON THE PIPELINE AT 12 O'CLOCK POSITION BY UNKNOWN PERSON(S) FOR THEFT ACTIVITY.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Environmental Barge Leakage at Nembe 1 Manifold.
ANGO FLOW STATION AT KOLUAMA
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
11 WELLHEAD MANIFOLD AT OKPAI COMMUNITY