Incident 2023/SAR/NL/063 · NAOC · 9 May 2023
4/3" FLANGE VALVE WITH PIPE CONNECTION WAS INSTALLED ON THE FACILITY AT 12 O'CLOCK PIPE POSITION TO CARRY OUT CRUDE OIL THEFT.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI