Incident 2024/SAR/GL/020 · NAOC · 7 Apr 2024
130mm hacksaw cut was inflicted on the facility at 4-9 o'clock position.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI