Incident 2024/SAR/073 · NAOC · 31 Mar 2024
A 3" VALVE INSTALLED WITH A HOSE ON THE FACILITY AT 12 O'CLOCK POSITION BY UNKNOWN PERSONS.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI