Incident 2024/LAR/NLI/049 · NAOC · 7 May 2024
80MM HACKSAW CUT WAS INFLICTED ON THE GAS DELIVERY PIPELINE AT 7 O'CLOCK POSITION BY UNKNOWN PERSONS
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI