Incident 2024/LAR/036 · NAOC · 3 May 2024
A 160MM HACKSAW CUT WAS INFLICTED UPON THE GAS DELIVERY PIPELINE AT 2-7 O'CLOCK POSITION BY UNKNOWN PERSONS. THERE WAS A PIT FILLED WITH GAS EMULSION WITHIN THE INCIDENT POINT
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI