Incident 2015/LAR/049/173 · NAOC · 7 May 2015
A 1.5'' valve with 5m pipe connection to the 6'' facility was observed along the NAOC ROW by crude oil vandals. No crude oil spill was seen at the time of investigation. Repairs using metal cup welded at 12 O' Clock position
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.