Incident 2015/SAR/070/102 · NAOC · 16 Mar 2015
3" VALVE WAS MOUNTED ON THE PIPELINE @ 12 O CLOCK POSITION FOR CRUDE OIL THEFT.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI