Incident 2014_1280235 · SPDC · 2 Nov 2014
There was an evidence of drill hole on the pipeline at 12 '0 clock position as at the time of inspection
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
6'' AGGU A LOCATION
12" Oguta - Egbema P/L Umunku, Oguta LGA, Imo State.
OSSU OBODO WELL-14/21 AT OSSU OBODO
16" EGBEMA - ASSA TL ROW @ ETEKWURU, OHAJI/EGBEMA LGA, IMO STATE