Incident 028/2015 · CHEVRON · 24 Mar 2015
A 6'' pipe was dis membered at the base which was as a result of an explosion by unknown persons,the explosive was also incased in a polymetric material.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
9B - 83 WELL FLOWLINE @ OLERO RMP 17
OLERO BENIN RIVER BR-13D FLOW LINE @ RMP-1
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma