Incident 2015/SAR/096/135 · NAOC · 7 Apr 2015
UNKNOWN PERSON(S) INSTALLED 3'VALVE @12 0' CLOCK POSITION FOR CRUDE OIL THEFT ACTIVITIES
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI