Incident 2015/SAR/094/133 · NAOC · 6 Apr 2015
THE VANDALS CUT OPEN TWO(2) CONE OF INSTALLED 3" NIPPLE (A) AND 4" VALUE @POINT (B).
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI