Incident 2024/NL/LAR/043 · NAOC · 13 Apr 2024
VANDALS INSTALLED 2" VALVE WITH PIPE CONNECTION AT 12 O' CLOCK POSITION OF THE PIPELINE FOR THEFT ACTIVITY.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Environmental Barge Leakage at Nembe 1 Manifold.
ANGO FLOW STATION AT KOLUAMA
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
11 WELLHEAD MANIFOLD AT OKPAI COMMUNITY