Incident NEPL/HSE/KGG/001/23 · NEPL · 20 Oct 2023
Unknown persons installed lower Master valve Nipple at 6 O' clock position on the pipeline.
IMO-RIVERS WELL 65T FLOWLINE AT OWAZA, UKWA WEST L.G.A ABIA STATE
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
OLD ABANDONED WELL-3 AT OTOKOLOMABIE