Incident 2023/SAR/200 · NAOC · 16 Aug 2023
The spill was as a result of sabotage since there was a visible installation of 2'' valve on the pipeline at 12 O'Clock position. The area of impact are outside company right of way. Vegatation were Impacted.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI