Incident 2023/SAR/186 · NAOC · 3 Aug 2023
THE SPILL WAS AS A RESULT OF SABOTAGE SINCE THERE WAS A VISIBLE INSTALLATION OF 3'' VALVE ON THE PIPELINE AT 12 O'CLOCK POSITION. THE AREA OF IMPACT WAS WITHIN COMPANY RIGHT OF WAY. VEGETATION WAS IMPACTED.
Environmental Barge Leakage at Nembe 1 Manifold.