Incident 2023/SAR/030 · NAOC · 10 Feb 2023
THE CAUSE WAS AS A RESULT OF SABOTAGE SINCE THERE WAS A VISIBLE INSTALLATION OF 3'' VALVE AT 12 O'CLOCK POSITION. THE IMPACTED AREA WAS WITHIN COMPANY RIGHT OF WAY. VEGETATION WERE IMPACTED.
Environmental Barge Leakage at Nembe 1 Manifold.